east of the stadium - starting Sep. 12
Generator testing will take place intermittently between September 12-21, from 7:30 a.m. to 4 p.m., at the generator building being constructed between the Stadium and McCracken Power Plant. Generators will run for periods of time from several minutes to a few hours. Elevated noise levels can be expected during this time. This project is part of the start-up for the South Campus Central Chiller Plant.
Project Manager Al Stazzone.
Aronoff loading dock - starting Sep. 17
The Aronoff loading dock at 12th Ave. between Cannon & Neil will be closed to vehicle traffic from Monday, Sep. 17, through Monday, Oct. 1. Pedestrian accessibility will be maintained along both sides of the loading dock. This project is part of the 12th Avenue steam vault repair.
Project Manager Al Stazzone.
Bike path south of Drake Union - starting Sep. 17
The bike path (Olentangy Trail) south of Drake Union will be detoured for installation of the electric duct bank under the river. This detour is expected to last through mid-December. map
Project Manager Tom Carmody.
|
 |