Paving on Scott Lot Roadway

Beginning Friday (7/24) early morning through Monday (7/27) early evening, the roadway to Scott Lot will be repaved. Two-way traffic will be maintained in one lane. Traffic control officials will assist with traffic flow during peak hours as warranted.