On March 8, beginning at 10 a.m. and continuing through early afternoon, the sidewalk and entrance to the 4-H Center will be blocked for a crane lift. Access to the building will be maintained via the building's west entrance.
On March 8, beginning at 10 a.m. and continuing through early afternoon, the sidewalk and entrance to the 4-H Center will be blocked for a crane lift. Access to the building will be maintained via the building's west entrance.