Billing Rates

Billable Services

Facilities Operations and Development has the desire and technical expertise to perform your department services that are not covered by POM funding. Some of these projects may require submitting a Project Request.

Examples of Billable Services

  • Minor renovations, conversion of space, installation and/or maintenance of specialized equipment affecting the building systems.
  • Repair of department equipment, such as window air conditioners, furniture, etc.
  • Installation of items that require only minor modifications, such as pictures, wall brackets, wall clocks, etc.
  • Fabrication of shelves and equipment, non-scheduled painting, changing ventilation equipment, adding electrical service, etc.

Billable/Non-Billable Services Guide

Billing Rates

Campus Services

Year 2016 2015

Skilled Crafts

Regular

Overtime

$40.25/hr

$51.35/hr

$40.25/hr

$51.35/hr

Campus Service

Regular

Overtime

$38.10/hr

$49.15/hr

$38.10/hr

$49.15/hr

Custodial

Regular

Overtime

$28.00/hr

$33.40/hr

$28.00/hr

$33.40/hr

Consultant

Regular

Overtime

$41.10/hr

$52.00/hr

$41.10/hr

$52.00/hr

Solid Waste Truck* (hourly) $112.00/hr $112.00/hr
Solid Waste Pick-up $29/stop $29/stop
Vac Truck* $75/hr $75/hr
Large Dump Truck* $30/hr $30/hr
Landscape Truck* $30/hr $30/hr
Moving Services can be arranged when in conjunction with capital projects. Call Service2Facilities for a quote. Call Service2Facilities for a quote.
Trash Disposal - Customer must dump trash at the compaction center (2566 Kenney Road). $31.55/cu.yd. $31.55/cu.yd.
Dumpster - Billed at our cost.  Includes delivery & pick-up. $82.50 /unit $82.50 /unit
Mower* $30/hr $30/hr

Design and Construction

Year 2016 2015
<$1M 5.00% 5.00%
$1M - $4M 2.50% 2.50%
$4M - $20M 2.25% 2.25%
20M+ 2.00% 2.00%
Cost Estimating $500 $500
State Project Fee 1.50% 1.50%

Special Events

Year 2016 2015

Trash Drums - 55 gallons each

1-10 Drums - 1-hr Min Charge

11+ Drums - 2-hr Min Charge

TBD TBD
Trash Drum Liners $0.50 ea $0.25 ea
Biodegradeable Liners $1.00 ea $1.00 ea
Large Biodegradeable Liners $2.00 ea $2.00 ea
Zero Waste Trash Can $3.75 ea $3.75 ea

Information Planning and Design

Year 2016 2015
Building Drawing Archives - 1-hour Min $41.10/hr $41.10/hr
Campus Mapping - 1-hour Min $41.10/hr $41.10/hr

Utility Marking

Regular

Overtime

$41.10/hr

$52.00/hr

$41.10/hr

$52.00/hr

Radiation Safety

Year 2016 2015
Damanged, lost, late badge (dosimeter) $15.30 ea $15.00 ea
Genesis Ultra 36 MCP TLD badge

$1.88/mo

$5.64/qtr

$1.84/mo

$5.52/qtr

Ultra or flex ring 18 badge

$2.92/mo

$8.76/qtr

$2.86/mo

$8.58/qtr

35 MCP TLD + Cr39 Badge

$9.36/mo

$12.48/qtr

$9.18/mo

$12.24/qtr

Badge Board

Small

Medium

Large

$26.01

$36.41

$52.02

$25.50

$35.70

$51.00

Radioactive Waste Removal

Year 2016 2015
Dry Active Waste (offsite disposal) $298.60/cu.ft. $292.75/cu.ft.
Dry Active Waste (decay) $130.05/cu.ft. $127.50/cu.ft.
Mixed Waste Actual Cost Actual Cost
Sealed Sources Actual Cost Actual Cost

Utilities

Year 2018 2017 2016 2015
Electric per KWh $0.08358 $0.09022 $0.09029 $0.09047
Water & Sewer per CF $0.0700908 $0.065208 $0.063624 $0.063624
Steam per 1,000 lb $17.4017 $16.77081 $18.45744 $18.46
Chilled Water per Ton Hour $0.25391 $0.26506 $0.266150 $0.25361
Gas per CF $0.00745205 $0.00677479 $0.008417 $0.008278