Crane Lift at Doan Hall

Beginning June 29 at 1 p.m. and continuing through July 1 evening, and again beginning July 6 at 1 p.m. and continuing through July 8 evening, the drive area east of Davis Heart and Lung Research Institute will be staged for a crane lift and construction materials and vehicles.  Access to the Doan Hall loading docks will be maintained.