Millikin Road Closed for a Crane Lift

Beginning June 4 at 8 a.m. and continuing through June 6 mid-day, Millikin Road will be closed for a crane lift to McCracken Power Plant.  Pedestrians will be detoured to the west of McCracken or to the east of Baker Systems.  Access to McCracken will be via the Central Service Building entrance near the bicycle racks.  Access to Baker Systems will be at the main entrance on the east side of the building.  Loading docks and parking will be inaccessible.  Alternative ADA parking will be at Tuttle Park Place Parking Garage or Northwest Parking Garage.