Sidewalk Work at Newton Hall

Beginning Monday (8/7) and continuing through Monday (8/14), the sidewalks on the south side of Newton Hall will be replaced, and signage will detour pedestrians around the area.  The south entrance will be closed during this time.  ADA access will be maintained through the east entrance.