Short-Term Bike Trail Detour by the Stadium

 

UPDATE Sep. 26 - This project has been postponed.

* * * *

Beginning Monday (9/30) and continuing for approximately two weeks, soil testing will occur at various locations west of the Stadium toward the Veterinary Medical Center. Equipment will sit atop each location and collect soil samples at various depths. The exact schedule and order of drillings will be variable because of access, weather, and rate of progress.

The portion of the Olentangy Bike Trail west of the Drake Performance and Event Center will be closed on approximately Oct. 7-8 to accommodate the work in that area (weather dependent), with signage detouring cyclists to the east side of the building.